Toilet Flange Level Or Above Floor

Ideal height of toilet flange.
Toilet flange level or above floor. This is very important. Optimum flange height to aim for is 1 4 inch above the finished floor. To get the necessary clearance from the floor you can add a toilet flange. Wax ring this secures the flange to the base of the toilet.
Large bolts thread up through. Though above floor installation is considered the right way to fit a flange some swear by attaching it level with the floor. If your flange sits even or below the floor then it s wrong. This might help you if you are trying to set a toilet with a high flange.
If the toilet flange is at the incorrect height it will cause problems with the toilet connecting onto the plumbing. If you recently tiled or changed the bathroom flooring the flange height is likely less than optimal. Toilet flange before you purchase the new part identify the specific type you have. When you install your toilet flange it should be installed on top of the finished floor and it should also be installed perfectly level.
The perfect height for the toilet flange is to be the same level as the finished floor. Toilet flange bolts have new bolts on hand in case your existing parts are stripped or rusty. When installing the toilet flange you need to check that it s the correct height and is also perfectly level. This particular toilet flange was 5 8 above the floor level.
It has to sit evenly on top of the finished floor. A toilet drain flange can sit above or below the finished floor level. Bring it to a local home depot store for help determining if you need a pvc copper iron or aluminum replacement toilet flange. This typically allows for almost any type of wax ring to be used and still ensure a good seal.
The reason being is because the toilet recesses into the flange when. The optimum toilet flange height is approximately inch above the floor to achieve the best seal and overall fit. The installation process is the same for a tile floor a hardwood or carpeted bathroom floor. Purchase a new one.
In most cases the floor of a bathroom is tiled and in this case the tiling is done after the flange is installed.